- Project No:
- 0911
- Project Title:
- Nasiriya Oil Field Development - IRAQ
- Client:
- Weatherford MENA
- Start - Finish:
- 2009
- Venture Type:
- Alone
Detailed Description:
2 Billion Barrels Reserv Capacity Oil Field Development Front End Engineering Design (FEED)
1 Central Proccessing Facility (CPF)
3 Oil and Gas Gathering Center (GC)
232 km, 36 inch Heavy Crude Oil Export Pipeline
36 km, 20 inch Light Crude Oil Export Pipeline
23 km, 10 inch LPG Export Pipeline
5 km, 24 inch Natural Gas Export Pipeline
12 km, 24 inch Well Field Trunk Pipelines
13 km, 20 inch Well Field Trunk Pipelines
7 km, 18 inch Well Field Trunk Pipelines
40 km, 8 inch Well Field Flow Pipelines
66 km, 6 inch Well Field Flow Pipelines
35 km, 16 inch HDPE Raw Water Pipeline
3 River Crossing (Euphrates River)
19 Motorway and State Highway Crossing
3 Railway Crossing
22 Channel and Ditch Crossing
27 Pipeline Crossing
Services Provided By ESER
Conceptual Enginering
Basic Engineering