- Project No:
- 0308
- Project Title:
- Konya Light Rail System
- Client:
- Konya Metropolitan Municipality
- Start - Finish:
- 2003 - 2004
- Venture Type:
- Alone
Detailed Description:
Light Rail System Basic Engineering Design
Economical and Financial Feasibility
Total 32 km, 50,000 Passengers/day at year 2020
New Kunduracilar-Saracoglu (Fetih Street) Line, 9.1 km
New Alaaddin-Peripheral Road Line, 4.6 km
Capacity Increase of Existing Alaaddin-Selcuk University Line, 18.7 km
2 each Sleeping Area
Daily Maintenance Workshop (2x450 sqm)
Crew Building (2x120 sqm)
Parking Area for cars
12 each new 31.5 KV/0.675 kV, 1,250 kVA Transformer/Rectifier Station
Each having 1,000 KW Rectifier
Capacity Increase of Existing 6 each 31.5 KV/0.525 kV, 1,100 kVA Transformers
750 VDC Catanery System
Signalisation System
Services Provided By ESER
Economic and Financial Analysis
Cost Estimations
Feasibility Study
Basic Engineering
Topographical Surveys
Transportation Study