- Project No:
- 0703
- Project Title:
- Izmir Bornova Hospital - Bornova Center Metro Line
- Client:
- Izmir Metropolitan Municipality
- Start - Finish:
- 2007 - 2010
- Venture Type:
- Alone
Detailed Description:
3282 m Metro Line Construction Supervision
Izmir Rail Transportation System 3rd Stage 1st Section
Between Bornova Hospital-Bornova Center (700.000 passenger/day)
Integrated with Izmir Metro Konak-Bornova System
Line Length : 3282 m
Bored Tunnel : 761 m
U Section Tunnel : 774 m
Cut and Cover Tunnel : 1366 m
Cut and Cover Station : 381 m
University, Evka-3 and Bornova Central Stations
10.5 kV and 34.5 KV Power Supply and Catenery System
Signalisation and Communication Systems
SCADA System
Services Provided By ESER
Tender Evaluation
Tender Documentation
Construction Supervision
Construction Management
Commissioning
Start-up Inspections
Geotechnical Studies
Cost Control & Time Scheduling
Project Management
Basic Engineering
Topographical Surveys