- Project No:
- 0708, 0820, 0310, 0101, 9915, 9813
- Project Title:
- Golcuk Naval Base Facilities
- Client:
- Ministry of National Defense
- Start - Finish:
- 1998 - 2010
- Venture Type:
- Alone
Detailed Description:
0820 - Submarine and Frigate Quays and Piers Restoration
0708 - Other Restoration Works
Torpedo Pier Restoration (63 each Fender Installation)
Fuel Piping System Restoration
9 each Torpedo Igloo Restoration
92 m Extension of the Logistics Pier
East Submarine Quay Expansion
0310 - New Facilities
East Submarine Piers
2 each Submarine Finger Pier (60m x 10m + 20m x 7.5m)
Transformer Rectifier Building (100 sqm, 1.5 Ton Crane)
2 x 100 kVA, 380/220 V, 50 Hz - 120/208 V, 60 Hz Frequency Converter
2 x 200 kVA, 380/220 V AC - 250 V DC Rectifier
Transformer Building, 34.5/0.4 kV, 800 kVA Dry Type Transformer
NB Fuelling Pier
Fuelling Pier (75m x 10m+75m x 6m)
Pump Station
Transformer - Generator - Office Building
400 kVA Transformer and 400 kVA Stand-by Generator
Torpedo Headquarters Building (866 sqm)
Ordnance Headquarters Building (1,670 sqm)
Spare Parts Warehouse (790 sqm)
Restoration of Existing Facilities
Logistics Pier (206 m x 20 m)
Ammunition Storage Igloos (9 each)
Fuel Storage Tank (10 each)
6 and 8 inch JP-5, F-76 Fuel Pipelines
Pump Stations, Valve Pits and Pipe Racks
Ex-proof Lighting, Power and Fire Alarm Systems
Cathodic Protection Systems
0101 - Fuel Loading and Unloading Pier
Fuel Pier (150 m)
75 m x 8 m + 75 m x 6 m reinforced concrete fueling pier
126 each 800 mm diameter steel piles
4 inch and 6 inch fuel pipes
Fire water, potable water and pressurized air systems
Pier lighting, fire alarm and communication systems
Pump station on the pier (120 cum/hour, 110 mss)
Transformer - Generator - Office Building (204 sqm)
400 kVA Transformer and 400 kVA Stand-by Generator
4, 6, 8 inch Fuel Piping System (2,500 m)
Fire water piping system
Restoration of pump stations, storage tanks, valve pits and pipe galleries
Ex-Proof Lighting, Power, Fire Alarm and Cathodic Protection Systems
9915 - Renewal of Marine Facilities at Golcuk Area
MK-46 Torpedo Pier and Compressed Air System
Konca Mine Pier and Fire Hydrant System
Konca Fuel Loading Pier
Submarine Piers
Submarine Battery Charging Facilities
Submarine Transformer and Converter Buildings
Submarine Water Storage and Deionization Facility
Topel Airfield Flight Control Tower
Topel Airfield Fire Station
Topel Airfield Vehicle Maintenance Shop
3,750 m, 24 inch Steel Piling
16,064 cum Rock Fill to Seafront
13,600 cum Stabilized Material Fill
2,392 cum Concrete Pavement
Mechanical and Electrical Restoration Works
9813 - Logistics Pier Extension
100 m x 25 m Extension of the Existing Logistics Pier
48 inch diameter, 2,000 m Steel Pipe Piles
Anchoring Dolphen for Floating Pools
74 sqm Transformer Rectifier Building
1600 kVA, 34.5/0.4 kV Power Transformer
34.5 kV MV Switchgear System
LV and Power Factor Correction Systems
220 VDC, 265 kW DC Rectifier System
Cathodic Protection System for the Pier
Steam, Compressed Air, Freshwater, Dirty Water, Waste and Compressed Sea Water Lines on the Pier
9108 - Kdz.Eregli and Gocuk Submarine Battery Charging Stations
Kdz.Eregli Naval Base
Splinter Protected Steel Power Plant 150 sqm
1,500 kVA Rectifier
1,250 kVA Transformer and Switchgear Systems
15 kV HV Underground Cable (800 m)
Pier Service Boxes
Charge and Discharge Systems
Telephone, Fire Alarm and Lighting System
Grounding System
Golcuk Naval Base
Reinforced Concrete Power Plant 300 sqm
2x1,500 kVA Rectifier
2x1,250 kVA Transformer and Switchgear Systems
34.5 kV HV Underground Cable (2,000 m)
Pier Service Boxes
Charge and Discharge Systems
Telephone, Fire Alarm and Lighting System
Grounding System
Services Provided By ESER
Detailed Engineering
Cost Estimations
Tender Evaluation
Tender Documentation
Construction Supervision
Construction Specifications
Commissioning
Start-up Inspections
Geophysical Studies
Geotechnical Studies
Basic Engineering
Topographical Surveys