- Project No:
- 1105
- Project Title:
- Mersin-Ipsala Natural Gas Pipeline (1,108 km)
- Client:
- Turcas Inc.
- Start - Finish:
- 2011
Detailed Description:
15 bcm/year - 1,108 km
Pipeline Length (1,108 km)
Pipeline Diameter (42 inch)
Pipeline Wall Thickness (17.88 mm)
Pipeline Operating Pressure (52-100 barg)
Pipe Material (API 5LX65)
Marmara Sea Crossing (17 km)
Entry Pressure Reducing and Metering Station (1 each)
Exit Metering Station (1 each)
Compressor Station (2 each x 22 MW)
Pig Station (5 each)
Line Valve (39 each)
Pipeline Crossing (19 each)
Fault Crossing (15 each)
Railway Crossing (10 each)
State Highway/Road Crossing (327 each)
River / Stream Crossing (408 each)
Over Head Line Crossing (114 each)
Services Provided By ESER
Cost Estimations
Pre-Feasibility Study
Conceptual Enginering
Licence Application