- Project No:
- 0301
- Project Title:
- Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Pump Stations
- Client:
- CBI John Brown Limited
- Start - Finish:
- 2003 - 2004
- Venture Type:
- Alone
Detailed Description:
PT1 - Posof Custody Metering and Pump Station ( h = 1,720 m )
PT2 - Dumlu Pump Station ( h = 1,720 m )
PT3 - Cayirli Pump Station ( h = 2,028 m )
PT4 - Kangal Pump Station ( h = 1,595 m )
Security Building (315 sqm)
Operation Building (840 sqm)
Canteen (361 sqm)
Guest House (333 sqm)
Workshop (792 sqm)
Pump House (1,680 sqm)
Piping House (1,071 sqm)
Scraper Station (375 sqm)
Waste Collection (48 sqm)
Utility Building (G.R.S) (176 sqm)
Utility Building (Heating) (297 sqm)
Utility Building (F.F) (119 sqm)
Watchtowers ( 3 x 35 sqm)
Car Sheds ( 48 x 12.5 sqm)
Housing Compound ( 5 x 784 sqm)
Relief Facilities Building (400 sqm)
Helipad (50m x 50m)
IPT1 - Intermediate Pigging Station ( h = 1,315 m)
Piping House (966 sqm)
Utility and Operation Building (767 sqm)
Scraper Station (375 sqm)
Fire Fighting Building (126 sqm)
Works Performed by ESER
Construction Drawings
Special Engineering Construction Details
Civil Drawings - Site Grading, Pits, Foundations, Supports, Platforms, Fencing
Architectural Details
HVAC System
Electrical Systems Including Cable Schedules and Wiring Diagrams
Final Material Take-Off
Final Data Sheets
Specifications, Method Statements and Procedures
Engineering Data Book
Final Layout Drawings
Material Requisitions
Technical Bid Evaluation
Services Provided By ESER
Construction Shop Drawings
Procurement Documentation
Construction Engineering Support Services