- Project No:
- 0315
- Project Title:
- Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Horasan - Sivas Section (Lot-B)
- Client:
- Streicher - Timmerman - Gunsayil - Alarko (STA) Joint Venture
- Start - Finish:
- 2004 - 2005
- Venture Type:
- Alone
Detailed Description:
Baku - Tbilisi - Ceyhan Crude Oil Pipeline
Horasan - Sivas Section (Lot B) 42 inch, 465 km
River, Road and Railway Crossings
Irrigation Channels Crossings
Crossings at Steep Slopes and Side Slopes
Crossings at Land Slides
Concrete Coating of Pipes
Piping and Hydrostatic Tests
Construction and Installation Works at Ball Valve Stations
Mechanical Completion Reports for Ball Valve Stations
Hydrostatic Tests at Ball Valve Stations
Earth Works, Excavation and Backfilling
Concrete Works, Foundations, Structural Steel and Fencing
Permanent Access Roads
Electrical and Instrumentation Works
Route Changes
Field Engineering and Pre-Construction Survey
Cathodic Protection Systems
Work Method Statements and Procedures
As-Built Documentation
Services Provided By ESER
As-Built Documentation
Construction Shop Drawings
Topographical Surveys
Construction Engineering Support Services