- Project No:
- 0106
- Project Title:
- Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline Crossings Survey
- Client:
- Botas Inc. BTC Directorate
- Start - Finish:
- 2001
- Venture Type:
- Alone
Detailed Description:
On 1,070 km Baku-Tbilisi-Ceyhan Crude Oil Pipeline Route
18 each River Crossing Width Greater than 30 m.
26 each River Crossing Width Between 5-30 m.
84 each River Crossing Width Less than 5 m.
2 each Main Highway Crossing
6 each Railway Crossing
The following tasks were performed during the execution of the works in order to find river water velocity at different levels and risk of flood to the pipeline:
Necessary Permission Letters
Coordination with State Authorities
Desk top Studies and Coordination with Botas
Supply of Necessary Equipment
Site Survey
Evaluation of Site Data
Submission of River Crossing Report
Reporting
Services Provided By ESER
Geophysical Studies
Basic Engineering
Topographical Surveys