- Project No:
- 0312
- Project Title:
- Ankara Golbasi Natural Gas Pressure Reducing and Metering Station
- Client:
- Turkerler Construction Inc.
- Start - Finish:
- 2003 - 2004
- Venture Type:
- Alone
Detailed Description:
RMS - A Type Pressure Reducing and Metering Station
Class : ANSI 600
Maximum Capacity : 1,000,000 Nm3/h
Operation Inlet Pressure : 25 - 75 barg
Operarion Outlet Pressure : 12 - 40 barg
Design Inlet / Outlet Pressure : 75 - 49 barg
Hydrostatic Test Pressure : 112.5 barg
Silicon Filter : 3 each
Heater : 4 each (Water Bath)
Pressure Reducing and Control System : 3 + 1
Metering System : 6 each
Temperature Control Unit
Ultrasonic Metering System
Inlet and Outlet Pig Stations
Drainage Tank
Control Building (90 sqm)
Security Building (32 sqm)
Stormwater Drainage System
Equipment, Piping, Steel Platforms, Supports and Foundations
Concrete Access and Internal Roads : 300 m
Concrete Paved Areas : (10,000 sqm)
Services Provided By ESER
As-Built Documentation
Detailed Engineering
Construction Shop Drawings
Construction Specifications
Operating and Maintenance Instructions
Commissioning
Start-up Inspections
Procurement Documentation